WHY OFFSITE MANUFACTURING

Greater Project Certainty
Offsite manufacturing is often underestimated. It improves quality, brings greater programme certainty, enhances safety, increases efficiency and supports more sustainable delivery.
Quality
• Stable factory conditions
• Consistent workmanship
• Controlled finish quality
Efficiency
• Smoother production flow
• Less waiting between trades
• Less disruption on site
Programme
• Factory and site works in parallel
• Fewer weather delays
• More predictable schedules
Sustainibility
• Less material waste
• More efficient use of resources
• Lower impact on site
Safety
• Controlled work environment
• Less onsite work at height
• Clear safety procedures
Cost Certainty
• More accurate early pricing
• Reduced onsite variations
• Better budget control
HOW WE BUILD

A controlled process from frame to finish.
Each module moves through a controlled factory process, from structural framing to final inspection.
Plan
• Production drawings confirmed
• Materials prepared
• Manufacturing sequence planned
Frame
• Floor frames assembled
• Wall frames installed
• Roof structure completed
Services
• Electrical installation
• Hydraulic connections
• Mechanical services
Fit out
• Internal wall linings
• Joinery and fixtures
• Flooring and finishes
Enclose
• Roofing, cladding and fireboard
• Windows and external doors
• Insulation and weatherproofing
Complete
• Final inspections completed
• Quality checks and testing
• Modules prepared for delivery
QUALITY FRAMEWORK

Built. Checked. Recorded.
Inspection and Test Plans (ITPs) translate the Quality Management Framework into practical inspection checkpoints, ensuring every module is built, tested and certificated to the required standard.
Steel Structure ITP
• Steel Acquisition
• Welding
• Surface Coating
• Structural Assembly
External Envelope ITP
• Design and Documentation
• Material and Preparation
• Frame and Openings
• Membranes, Roofing and Testing
Drainage ITP
• Drainage Pipe Installation
• Toilet Installation
• Basin and Shower Waste Installation
Electrical ITP
• Electrical System Installation
• Telephone and Data Network
• Smoke Detectors
Interior Fit Out, Packing and Shipment ITP
Plumbing ITP
• Pre-line Inspection
• Internal Fit-out
• Pre-shipment Certification
• Hot and Cold Water Piping Installation
• Tapware Installation
• Bathroom Fixtures Installation
* Quality Management Framework and Project-specific ITPs record each module’s production inspections and are compiled into a Compliance Pack for the Building Code Authority to confirm compliance with Building Consent and/or Multi-Proof Certification requirements.