BUILT OFFISTE.
FINISHED ONSITE.
WHERE EVERY MODULE COMES TOGETHER.
JARL coordinates lifting, installation and completion on site.
SITE READY

Everything in place.
Before the first module is lifted, every onsite detail is coordinated for a safe and efficient installation.
Site Establishment
• Work zones and access control
• Temporary power and water
• Material storage areas
Foundation Confirmation
• Bearing points
• Anchor locations
• Module alignment
Installation Planning
• Module sequence
• Crew coordination
• Site safety controls
MODULE LIFTING

Controlled from the fisrt lift.
Each module is carefully lifted, positioned and secured in accordance with the installation plan.
Pick Up
• Module connected and prepared for lifting.
Lift
• Module moved safely through the planned lifting path.
Position
• Module lowered into its final location.
Secure
• Module temporarily stabilised before permanent connection.
CONNECTION

Built into one.
Once positioned, each module is connected, sealed and finished to form one complete building.
Structural Connections
• Intermodule connections
• Permanent fixing
• Structural securing
Building Envelope
• Roofing and flashings
• Cladding junctions
• Weatherproofing
Internal Completion
• Wall and ceiling junctions
• Floor finishes
• Final finishing works
HANDOVER

Ready for use.
Every system is tested, every detail is completed and all required documentation is prepared before the building is formally handed over to the client.
Testing and Commissioning
• Services testing
• System commissioning
• Performance checks
Quality Completion
• Final inspections
• Defect rectification
• Cleaning and presentation
Project Handover
• Compliance documentation
• Certificates and records
• Client handover